Shares Bazaar

NTPC informs about updates

NTPC has informed that it enclosed disclosure dated 18th March 2026 made by subsidiary NTPC Green Energy Limited (NGEL) titled ‘Disclosure under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015’ regarding declaration of COD of fourth part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL, with effective from 19th March 2026. With this, the total installed capacity of NTPC group stands at 88,709 MW and commercial capacity at 87,629 MW.

The above information is a part of company’s filings submitted to BSE.